Archive for the 'behind the plaster' Category
living room demo is underway
Published July 31, 2008 Paul Kelley , Pete Marsters , behind the plaster , demolition , downstairs , living room , portraits , team hollander Leave a CommentTags: Add new tag, before living room, demolition, team hollander
was your house renovated by a jackass too?
Published July 25, 2008 Chicky Stoltz Home Improvement , bathroom , behind the plaster , demolition , downstairs , team hollander 4 CommentsTags: bathroom, bathroom renovations, demolition
I’m thinking of holding a photo contest of the most ass backwards renovations discovered during demolition. I mean really – are all these layers necessary? I started in on the downstairs bathroom demolition so a new wall could go up to house all the upstairs plumbing. In an effort to have at least one bathroom operational, I didn’t do the whole room (thank god). Not asking for walls or a sink, just a shower and toilet.
Behind the wall that held the door, were layers of sheetrock, particle board, and paneling. No studs.
Behind the north facing wall where my toilet is and pipes to the kitchen addition, was a layer of faux beedboard, sheetrock, plastic faux tile in sheet form, sheetrock, white plastic in sheet form, plaster and lathe. I’m guessing I just gained about 3″. No insulation except in one sketchy corner and I think that was a bed for critters.
Beneath the “tile” floor was an insane amount of glue, piece of plywood with brad staples ALL OVER, nother piece of plywood, original floor. It took about 1 1/2 hours to get up 5 sq ft.
So we did manage to get a little wall up, as square as we possibly could, but not only was the floor not level, one of the beams appears to be sagging a good 3″.
if only walls could talk
Published April 7, 2008 behind the plaster Leave a CommentTags: behind the plaster, old farmhouse, old walls, renovations













































